Gravel added and floor graded. |
The insulation is mostly placed. |
Time to pour the slab! |
Giant hoses deliver the cement from the driveway. |
I hope they don't stand in that cement for too long... |
Our amazing team, led by our intrepid contractor James (on the left)! Leveling out the slab and stamping out the air bubbles. |
The slab is poured and level! Let's hope the insane amount of rain we received this weekend didn't do anything bad to it. |