| Gravel added and floor graded. |
| The insulation is mostly placed. |
| Time to pour the slab! |
| Giant hoses deliver the cement from the driveway. |
| I hope they don't stand in that cement for too long... |
| Our amazing team, led by our intrepid contractor James (on the left)! Leveling out the slab and stamping out the air bubbles. |
| The slab is poured and level! Let's hope the insane amount of rain we received this weekend didn't do anything bad to it. |
I have joined the blog! Can't wait to observe more progress.
ReplyDelete